A manager’s Monday: team dashboard, reports and the activity log

A manager with two or three projects cannot read every board every day, and should not try. What works is a short, fixed review once a week, with the same screens in the same order, so that the numbers mean something by comparison with last week.

This post describes that review using three pages in DeliverGoals: the team dashboard, reports & analytics and the activity log. The figures come from the Northwind Studio demo workspace, a fictional studio, as it stands on 15 November 2026. Daniel Reyes manages two of its projects: Website Relaunch for a client and Customer Onboarding Revamp internally.

21tasks in Daniel’s two projects
5completed
24%completion rate
3open and overdue
2.7open tasks per person

Stop one: the team dashboard (five minutes)

The team dashboard answers “how loaded is the team, and with what?” A selector at the top chooses which projects it covers; Daniel leaves it on all the projects he can see.

app.delivergoals.com · Team dashboard
Team dashboard for a manager across all accessible projects: 6 team members, 2 active projects, 16 open tasks (2.7 per person), 0 completed this week; tasks by priority (Urgent 3, High 9, Medium 8, Low 1); a tasks-by-status ring for 21 tasks (pending, in progress, completed); a projects overview with Website Relaunch 4/16 (25%) and Customer Onboarding Revamp 1/5 (20%); and a workload chart of open tasks per person from Aiko Tanaka with 4 to Sofia Rossi with 1.
Six people with open work, 16 open tasks, none completed in the last seven days. Workload, bottom right, is open tasks per person.

Read the priority mix first

PriorityTasksShareWhat to ask
Urgent314%Does each one have an owner and a date this week?
High943%Is this really high, or is high the default?
Medium838%Fine
Low15%If almost nothing is low, the scale is not being used

Twelve of twenty-one tasks are high or urgent. That is common and it is a warning: when most things are high priority, the label has stopped helping anyone choose. One useful Monday action is to move three “high” tasks down to medium, which takes a minute in the list view of each project.

Then the workload chart

This chart counts open tasks per person: a quick shape of the team, not a capacity plan. For hours against each person’s capacity, week by week, use the Workload page described in plan capacity before you promise.

Open tasks per person against the team average Aiko TanakaLucas MoreauTom BeckerDaniel ReyesPriya NairSofia Rossi 433221 average 2.7 open tasks per person
The demo’s workload redrawn against the average. Aiko has four open tasks, and one of them is the overdue hero.

Aiko Tanaka has the most open tasks, and from the stand-up Daniel already knows her hero illustration is a day late. The count and the blocker point the same way. That is when to act: move one of her tasks to someone below the average, or move a date.

And the projects overview

The projects table shows done against total for each project: Website Relaunch 4 of 16 (25%), Customer Onboarding Revamp 1 of 5 (20%). On its own a percentage says little. Next to the target date it says more: the relaunch has a beta in a week.

Stop two: reports & analytics (ten minutes)

Reports cover the same projects from the other side: not who has the work, but how it is flowing.

app.delivergoals.com · Reports & analytics
Reports and analytics across 2 projects: 21 total tasks, 5 completed, a 24% completion rate and 3 overdue open tasks; tasks by status (Pending 9, In progress 7, Completed 5); tasks by priority (Urgent 3, High 9, Medium 8, Low 1); and a throughput chart of tasks created and completed per week for the last 8 weeks, 21 Sep to 15 Nov 2026.
Totals, the split by status and priority, and throughput: tasks created and completed per week over the last eight weeks.

Overdue

The Overdue tile counts open tasks past their due date: three in the demo. This is the number to drive to zero every Monday, and there are only two honest ways to do it. Finish the task, or change its date and write why in a comment. Leaving it red is the third way, and it teaches the team that dates are decorative.

Status split

Nine tasks are pending, seven in progress, five completed. Seven in progress across six people is reasonable. If in-progress were twice the number of people, the team would be starting more than it finishes, and the fix is to stop starting.

Throughput

Throughput charts tasks created and tasks completed per week, with a selector for the period. In a workspace that has been running for a while, the two bars tell you whether the backlog is growing or shrinking:

Pattern over several weeksWhat it usually means
Created well above completedScope is growing faster than the team can deliver; cut or re-plan
Completed at or above createdThe backlog is shrinking; the plan is holding
Completed drops to near zero for a weekA holiday, a blocker affecting everyone, or people not moving their cards
One tall spike of createdA planning session; look at the following weeks instead

The demo shows the last of these: a single tall bar of 21 created tasks in the latest week, because the demo workspace was set up all at once. A real workspace will not look like that after a month. Read throughput as a trend over four to eight weeks and do not react to a single week.

Stop three: the activity log (five minutes)

The activity log lists what changed on your projects’ boards, newest first: tasks created, updated, moved, assigned, commented on, completed and deleted. Tabs filter by type, a search box finds a person or a task, and Export gives you the log as a file.

app.delivergoals.com · Activity logs
Activity logs across all projects, newest first: 21 events in 2 projects; filters for Created, Updated, Moved, Assigned, Commented, Completed and Deleted; entries such as Daniel Reyes created Audit analytics events in Website Relaunch, 23 minutes ago; a search box and an Export button.
The log filtered to all types. In the freshly created demo every entry is a “created” event by one person; a live project shows moves, comments and completions from the whole team.

On a Monday, use it for three specific checks:

  1. Deleted. Open the Deleted tab. A deleted task should never be a surprise.
  2. Moved. Scan for cards that went backwards, from In review to In progress. Each one is a small story about a review that found something.
  3. People active. The tile counts how many people did anything. If the board says work is in progress and the log says nobody touched it for a week, the board is out of date.

The same history is available per task, on the Activity tab of the task panel, when the question is about one card.

The whole review on one page

Monday, twenty minutes
  1. 5 min
    Team dashboard

    Priority mix; workload against the average; each project’s progress against its date.

  2. 10 min
    Reports

    Drive Overdue to zero by finishing or re-dating; check the status split; read throughput as a trend.

  3. 5 min
    Activity log

    Deleted, moved backwards, and whether people are touching the board.

  4. After
    Act

    Reassign one task, re-date what is late, and write the changes as comments on the tasks.

What these screens do not do

These screens are not emailed to you: the daily digest covers your own tasks, so the weekly review happens when you open the pages. The team dashboard counts tasks; capacity in hours is on the Workload page, and logged hours are in the time report. There is no sprint or burndown report.

Why the same three screens every week

None of these numbers is interesting once. They become useful in sequence: overdue went from three to zero and back to two; Aiko has been above the average for three Mondays running; completed has been below created for a month. A fixed routine is what lets you see that. Twenty minutes, same order, every week.

The daily counterpart to this review is the stand-up, covered in the ten-minute daily stand-up. All four pages are described on Stand-ups & reports.